NSW State Significant Developments open for public submissions.
These are the State Significant Development applications currently on public exhibition. Anyone can object — you don’t need to live next door. Pick a project, write a structured objection in about 2 minutes, then lodge it yourself on the NSW Planning Portal before the deadline.
Sourced from the NSW Planning Portal exhibition list. Always confirm the closing date on the official project page before relying on it.
Kogarah Golf Club Redevelopment - Concept & Stage 1 Works
Redevelopment of the Kogarah Golf Club site, with concept approval for five mixed-use residential/commercial blocks up to 70 metres in height plus Stage 1 site preparation works.
230 Martin Road, Badgerys Creek, Industrial Development
Demolition of existing structures and construction of an industrial estate comprising two warehouse buildings with ancillary offices and manufacturing operations including steel cutting.
Early Works at 17-24 Loftus Cr, Homebush
Early works for a mixed-use development, including demolition of all existing structures, tree removal, land remediation, shoring and bulk excavation, and augmentation of services infrastructure.
Mawson Avenue Bella Vista Shop Top Housing HDA
Construction of two mixed-use towers up to 40 storeys with podium and basement parking, including modifications to local planning provisions to increase permitted height and floor space ratio limits.
Bluestone Hardrock Quarry Project
A new hard rock quarry to extract and process up to 1 million tonnes of material annually over a 30-year operational period.
Shop-top housing - 120-122 Smith Street, Wollongong
A multi-tower residential development of three towers (30, 25 and 12 storeys) above a shared podium, with residential units, co-living spaces, retail/commercial areas and public domain improvements.
Mixed use development - 36-46 George St and 16-24 and 26 Elsie St, Burwood
Three towers of 32-43 storeys with shop-top housing, providing approximately 98,665 sqm of combined commercial and residential floor space including 900 dwellings, with 3% designated as affordable housing.
TOD - Key Site 6 Macquarie Park
Construction of a mixed-use residential and commercial development comprising over 400 residential apartments including an affordable housing contribution, with open space and road infrastructure.
Multi dwelling housing - Palmer Street Dubbo
Construction of 211 residential dwellings along with community facilities, car parking and landscaping in Dubbo.
Residential flat building with in-fill affordable housing - 19-25 Balfour Street, Lindfield
A nine to ten-storey residential flat building containing approximately 98 dwellings (71 market units and 27 affordable housing units) with basement parking, located near Lindfield railway station.
Mixed Use Development, Corner of Union and Kenrick Streets, The Junction
Shop top housing development comprising 38 apartments (2% affordable housing) and two levels of commercial floor space.
SEED - Stage 1B
Construction and operation of five warehouses, a cafe and supporting infrastructure as part of a warehouse and distribution centre development.
Aspect Industrial Estate Stage 6 Development (WH4)
Construction and operation of Warehouse 4, a warehouse and distribution facility within Stage 6 of the Aspect Industrial Estate.
Middleton Avenue Residential Apartments
Construction of a part 11 and part 14 storey mixed-use development comprising 109 residential apartments, a single cafe tenancy at ground level, and three basement levels.
Sunshine Estate Battery Energy Storage System
Construction, operation and decommissioning of a 120 MW / 480 MWh battery energy storage system (BESS) and associated infrastructure.
Newington College Redevelopment (Concept and Stage 1)
Concept approval for four building envelopes at Newington College plus detailed Stage 1 (Sevington Courts) providing indoor and rooftop courts, basement parking and landscaping, accommodating an additional 368 students.
Chatswood Grand Residences Mixed Use Development
A mixed-use residential development of 552 apartments across two towers of 56 and 60 storeys with ground-floor retail, including planning amendments to increase floor space ratio and building height and modify minimum non-residential requirements.
Comet Park Battery Energy Storage System
Construction of a 150 MW / 600 MWh battery energy storage system and associated infrastructure including grid connection.
Mixed Use Development - 19A-21 Gordon Street, Coffs Harbour
A mixed-use development including a place of worship, cafe, retail and commercial spaces, and 150 residential units with affordable housing components.
Ebor Battery Energy Storage System
Construction, operation and decommissioning of a 100 MW / 800 MWh battery energy storage system (BESS) and ancillary infrastructure.
Mixed Use Development - Flinders St, North Wollongong
A new 38-storey building combining 174 co-living units with 303 residential apartments (including 45 affordable units), plus landscaping and associated infrastructure works.
Leppington Residential Precinct 156-166 Rickard Rd
A high-density mixed-use residential precinct comprising 1500 apartments across 10 buildings (including 15% affordable housing), commercial/retail floor space and open space.
Rothbury Battery Energy Storage System
Construction and operation of a battery energy storage facility rated at 135MW/540MWh with associated infrastructure for electricity generation purposes.
Air Liquide CO2 Processing Plant, Bomaderry
Construction and operation of a CO2 processing plant with a production capacity of 100,000 tonnes per annum of food grade CO2, plus associated pipeline infrastructure, equipment and storage facilities.
Mixed-use development at 815 Pacific Highway, Chatswood
Demolition of the existing structure and construction of a 61-storey mixed-use tower with 506 apartments (including 100 affordable housing units), commercial and retail space, and up to 8 basement levels.
Mixed Use Development 10 London Street and 43 North Parade, Campsie
A mixed-use development with shop-top housing positioned above commercial premises.
Leppington Civic Centre - 173-183 Rickard Road
A mixed-use development of approximately 2,100 residential apartments across 8 buildings of 24-30 storeys (up to 96m), with around 25,000 sqm of retail/commercial space and roughly 6,500 sqm of open space.
Glenfield Industrial Precinct - Precinct 1
A warehouse and distribution facility with associated office space and food and beverage venues, plus supporting road and stormwater infrastructure and landscaping improvements.
The objection window is often just 28 days. Get a free email or text the moment a development is exhibited in your area — in time to object.
We’ll match new State Significant Developments to your council area — no need to pick it yourself.
Describe any development proposal and we’ll structure the objection for you.
Drafting support, not legal advice. Verify deadlines and documents on the official portal.More
ObjectionEngine prepares draft wording for your review only. It does not check current planning controls, exhibition periods or official documents, it does not lodge anything for you, and no legal relationship is created. Check the official application record and every factual claim before relying on any wording.