What is proposed at Glenfield

A warehouse and distribution facility with associated office space and food and beverage venues, plus supporting road and stormwater infrastructure and landscaping improvements.

Read the full application on the NSW Planning Portal

In plain English

Glenfield Industrial Precinct - Precinct 1 is a industrial proposed at Glenfield. In plain terms: A warehouse and distribution facility with associated office space and food and beverage venues, plus supporting road and stormwater infrastructure and landscaping improvements.

What it is
A warehouse and distribution facility with associated office space and food and beverage venues, plus supporting road and stormwater infrastructure and landscaping improvements.
Where
Glenfield, Campbelltown
Who decides
NSW Department of Planning, Housing and Infrastructure (not the local council).
Why it matters

It is on public exhibition now, which is the window when the community can put concerns or support on the official assessment record. Once it closes, that opportunity is gone.

Who it affects

Residents and businesses in and around Glenfield (Campbelltown) — anyone affected by traffic, noise, overshadowing, character or amenity changes during construction and once it is operating.

This is a State Significant Development, so it is large or sensitive enough to be decided by the NSW Department of Planning rather than the local council.

Plain-English summary generated by ObjectionEngine to help Glenfield residents understand the proposal. Always verify against the official material.

Documents on exhibition

50 exhibited files across 3 categories. The Environmental Impact Statement (EIS) is the main document to read and object to.

View all on the portal

Individual files open on the NSW Planning Portal, where the latest versions and any late-added documents are always shown.

Sample objection for this proposal

A starting point prepared by ObjectionEngine (template mode). Make it yours — submissions carry most weight when they add what only you know.

Personalise it

1.Truck movements and road safety

Material

The proposal has not demonstrated that its impacts on truck movements and road safety are acceptable for nearby residents, and the exhibited material should be tested on this point before any approval.

Based on the resident's stated local knowledge; the exhibited application material should be checked on this point.
Source Resident-supplied information — verify against the exhibited material
Assess against Relevant planning controls and public interest assessment

2.Noise from 24/7 operations

Material

The proposal has not demonstrated that its impacts on noise from 24/7 operations are acceptable for nearby residents, and the exhibited material should be tested on this point before any approval.

Based on the resident's stated local knowledge; the exhibited application material should be checked on this point.
Source Resident-supplied information — verify against the exhibited material
Assess against Relevant planning controls and public interest assessment
Read the full sample letter (all 3 grounds)

I object to SSD-89673472 at Glenfield, NSW. The exhibited development application should not be approved in its current form because the proposal asks the consent authority to accept material planning and amenity impacts while key evidence remains incomplete, fragile or insufficiently tested.

My local context is: I am a local resident near the site. This is a general sample submission prepared before individual residents add the specific details only they know. The development application is SSD-89673472, a development application before NSW Department of Planning, Housing and Infrastructure. The key concerns are truck movements and road safety, noise from 24/7 operations and air quality and dust.

1. Truck movements and road safety. The proposal has not demonstrated that its impacts on truck movements and road safety are acceptable for nearby residents, and the exhibited material should be tested on this point before any approval. The current record says: "Based on the resident's stated local knowledge; the exhibited application material should be checked on this point." (Resident-supplied information — verify against the exhibited material). This should be assessed against Relevant planning controls and public interest assessment.

2. Noise from 24/7 operations. The proposal has not demonstrated that its impacts on noise from 24/7 operations are acceptable for nearby residents, and the exhibited material should be tested on this point before any approval. The current record says: "Based on the resident's stated local knowledge; the exhibited application material should be checked on this point." (Resident-supplied information — verify against the exhibited material). This should be assessed against Relevant planning controls and public interest assessment.

3. Air quality and dust. The proposal has not demonstrated that its impacts on air quality and dust are acceptable for nearby residents, and the exhibited material should be tested on this point before any approval. The current record says: "Based on the resident's stated local knowledge; the exhibited application material should be checked on this point." (Resident-supplied information — verify against the exhibited material). This should be assessed against Relevant planning controls and public interest assessment.

For those reasons, I ask NSW Department of Planning, Housing and Infrastructure to refuse the application unless the applicant resolves the identified statutory and evidentiary gaps. Require corrected and independently reviewable supporting material before any favourable determination.

This sample is drafting support, not legal advice. Verify every point against the exhibited material before lodging anything.

Concerns residents commonly raise about industrial proposals

Tap one to start your submission with it. The strongest submissions add specifics only locals know — what you see, when, and how it affects you.

How to object in three steps

  1. 1Write a structured objection here — grounds, evidence points and a letter in your own voice.
  2. 2Verify the details against the exhibited material on the NSW Planning Portal.
  3. 3Lodge it yourself via the portal's Make a Submission page before 29/07/2026.
Start my objection
Local discussion
Anonymous is fine.
Loading discussion…

How far do you want to take it?

Start free. Go deeper when the stakes justify it.

Start free

Free

Everything you need to lodge a real objection yourself.

  • AI-structured first draft in about 2 minutes
  • Sample objection for this proposal
  • Blank template document to write into
  • Copy, PDF and shareable link
Download the template (.docx)

Full objection pack

$20

Everything we can assemble about this SSD, organised for objectors.

  • The planning controls that apply, with provision text to cite
  • Comparable determinations and what swayed them
  • Evidence checklist against the exhibited material
  • Citation-ready annexure format for your grounds

Custom research objection

$300

A bespoke deep-research objection built for your situation.

  • Deep AI research across the full exhibited material
  • Grounds drafted with document and page references
  • Tailored to your property and circumstances
  • Delivered as an editable document within 48 hours
Rally your neighbours — submissions count most before the deadline.
Drafting support, not legal advice. Verify deadlines and documents on the official portal.More

ObjectionEngine prepares draft wording for your review only. It does not check current planning controls, exhibition periods or official documents, it does not lodge anything for you, and no legal relationship is created. Check the official application record and every factual claim before relying on any wording.